Guide

Counting working days: which dates are actually available?

A month’s length does not tell you how many days you can schedule for a project. Your workweek, public holidays and personal days off all matter. The calculator separates those deductions so you can see what remains.

Simple desk clock and open paper calendar beside a pen.
Illustrative image

Quick answer

Only a scheduled working day can be removed

The calculator starts with your selected weekdays, then removes relevant holidays and the days off you entered. A date that is both leave and a public holiday reduces the total only once.

What matters

Your workweek determines which dates count

The calculator first includes the dates in your chosen range, then filters them by your regular working weekdays. Monday to Friday is only the default. For part-time work you can select Monday, Wednesday and Friday individually, or include Saturday and Sunday.

Use holidays for the actual place of work

Without an automatic calendar, only the dates you enter are treated as holidays or days off. This lets you use the tool for any country or year. The optional German calendar covers civil public holidays in 2026 by state. Municipal Corpus Christi, Assumption Day and Augsburg's Peace Festival require a separate selection when they apply.

Deduct each day only once

A holiday reduces working days only when it falls on a weekday you selected. A date entered as leave and already counted as a public holiday is still deducted just once. Dates outside the included period have no effect and are identified by a separate count in the result.

Choose how both boundary dates are handled

By default the start and end dates are included. You may exclude either or both. If start and end are the same date, that date counts only when both boundaries are included. The calculation uses calendar dates rather than elapsed hours, so daylight saving changes do not affect it.

Examples and comparisons

Two days off in October leave 20 working days

The period is 1 to 31 October 2026 with both boundary dates included. The workweek is Monday to Friday and automatic holidays are off. Enter 5 and 9 October as your own days off.

Which dates count?

October 2026 · Monday–Friday; both boundary dates included; automatic holidays off

12345678910111213141516171819202122232425262728293031
  • Working day
  • Weekend
  • Own day off

31 − 9 − 2 = 20 working days

The 5th and 9th are removed once each. A day off on a weekend would not reduce the result again.

Start date2026-10-01
End date2026-10-31
Count the start and end dates?Include both dates
Regular working weekdaysMonday to Friday
Holiday calendarYour own dates / no automatic holidays
Your holiday dates or days off (optional)2026-10-05, 2026-10-09
Remaining working days20 days

Load this example’s inputs in the calculator. Review them, calculate the result, then adapt the values to your own case.

Example calculation: 22 selected weekdays − 2 entered working days off = 20 working days.

Change one input

Working Saturdays adds five available days

Sensitivity check · only one input changedRegular working weekdays → Remaining working days

Direct comparison

Data points for the two calculated scenarios: Regular working weekdays and Remaining working days
ScenarioRegular working weekdaysRemaining working days
Scenario 1Monday to Friday20 days
Scenario 2Monday to Saturday25 days
Change from scenario 1 to scenario 25 days · +25% relative

Also verify before making a decisionOnly the workweek changes from Monday–Friday to Monday–Saturday. The date range, both days off and the boundary settings remain unchanged.

Assess your case

Which calendar matches your arrangements?

If you work only on particular weekdays

Choose those individual weekdays. An average of three days per week cannot represent their actual distribution across the calendar.

If local holidays apply outside Germany

Choose your own dates and use the official calendar for the place of work. Enter any observed substitute day explicitly too.

Checklist

Check before calculating

  • Confirm the first and last dates you want to schedule.
  • Select the exact weekdays in your regular working pattern.
  • Copy holidays and days off from your calendar as complete dates.

Common mistakes

Avoid common mistakes

Subtracting every public holiday

A holiday can remove only a date you scheduled as a working day. An already free Sunday produces no extra deduction.

Multiplying a weekly average into a month

Months do not contain a fixed number of identical weeks. Count the actual selected weekdays within the range.

Using Germany’s calendar for another country

Public holidays and substitute days depend on location. Use the manual option and enter the dates that actually apply.

What changes when Saturday is a working day?

From 1 to 31 October 2026, including both dates, there are 22 Monday-to-Friday weekdays. Entering 5 and 9 October as days off leaves 20 working days. Adding Saturday to the workweek adds five Saturdays, taking the total to 25. The dates and days off stay the same; automatic holidays are switched off in this example.

  • The selected weekdays and treatment of the start and end dates match my work schedule.
  • Public holidays and other days off are complete for my actual workplace.
  • I am planning whole days; half-days and changing shifts are handled separately.

Calculator for this guide

Does the calendar match your plan?

Check the selected weekdays, both boundary dates and holidays where the work takes place. A holiday on an already non-working weekday does not reduce the count again. Use the Working Time Calculator for hours per shift.
Open the matching calculator

How the calculation works

Calculation

Calculation method and model limits

Each included date passes through the same calendar checks. Their order prevents duplicate deductions.

1
Choose the date range

Apply your choice of whether the start and end dates count.

2
Apply the workweek

Keep only the weekdays you selected as regular working days.

3
Remove days off

Exclude relevant public holidays and entered days off, deducting any date at most once.

The remainder is a count of full working days under your calendar. Rotating shifts and half-days need a separate plan.

Simplified formula

Working days = selected weekdays within the included range − public holidays on those weekdays − other working days off. Each date is deducted at most once.

Transparency

Scope and assumptions

Calculation
Based on your inputs
Applies to
International
Currency
No monetary calculation
Units
No unit conversion needed
Based on
User-selected workweek and days off; optional German public holidays for 2026 only, based on Bundesbank and state holiday rules
Calculation baseline

Questions about working days and holidays

Does the count include the start and end dates?

Yes by default. You can choose to exclude the start date, end date or both.

Can I use a three-day working week?

Yes. Choose individual weekdays and select the three days you regularly work.

Can I use this outside Germany?

Yes. Choose your own holiday dates and enter the days off that apply where you work. No non-German public holiday calendar is assumed automatically.

Why does a weekend holiday sometimes make no difference?

If that weekday is not part of your workweek, it was already excluded. Deducting it again would undercount working days.

Can I include annual leave?

Yes, by entering each date off. Leave that overlaps a public holiday is deducted only once. The calculator does not determine statutory leave entitlement.

Continue calculating

Tools for the next calculation

You now have a day count. These tools help with working hours or unfiltered date intervals.

Editorial method

We test the worked example automatically with the same logic used by the calculator. Sources, inputs, rounding and model limits are listed separately. This does not replace case-specific professional advice.